CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES

HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]

CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES (BOTH DOMESTIC AND INDUSTRIAL) AT A MINIMUM RATE OF 300KG/HR WITH THE FOLLOWING SPECIFICATIONS:

Ø  PRIMARY CHAMBER VOLUME 7.2M³

Ø  BURNING CAPACITY 300Kgs/hr.

Ø  PRIMARY CHAMBER TEMPERATURE 850⁰C AND SECONDARY CHAMBER TEMPERATURE 1100⁰C

Ø  REFRACTORY THICKNESS 225MM; REFRACTORY WITHSTAND TEMPERATURE 1400⁰C

Ø  RAM LOADER CAPACITY 0.75M³; OPERATIONAL CYCLES PER DAY 8-16 Hrs.

Ø  FUEL DIESEL/NATURAL GAS; NUMBER OF PRIMARY BURNERS & RATING: 2 @ 250kw

Ø  NUMBER OF SECONDARY BURNERS & RATING: 2 @ 400kw; ELECTRICAL SUPPLY 230V 60Hz

Ø  BIN TIPPER, MONITORING SYSTEM, CLEANING SYSTEM

Ø  GAS CLEANING AND GAS MONITORING.MSW1000 General Medical Waste Incinerators burn rate up to 100kg/hr
A2400 Animal / poultry Waste Incinerators burn rate up to 200kg/hr.Laboratory  waste Management  system
01. Liqued water purification system.
02. Number of laboratories    – 05
03. The estimated liquid water waste    – 6000 L including
a. chemicals
b. toxins
c. Bio Hazardous materials.
Temporary allocated space for purifications system- 30×20
The following should be indicating in the biding document
1.Method of disposing treated waste water
2.Method of discarding the sludge
3.To follow ISO standard/regulations of Central Environment Authority[CEA]
4.Time frame for construction
5.Request the cost for each item of the project [Consultancy/designing/construction] as well for the whole project.
6.Warranty period and maintaincne.

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]