Diesel/LPG/LNG burning primary combustion chamber/primary combustion incinerator

HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]

Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter

heightItem 1
Incinerator model A

Burn Rate 65kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 850 °C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length

I000 Litre Fuel Tank + Pipe System, indicate volume

Additional chimney extension, indicate height

Warranty, indicate no of years

Item 2
Incinerator model B

Burn Rate 150kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Diesel/LPG/LNG, please indicate

Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Item 3
Incinerator model C
Burn Rate 250kg/h minimum

Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

High Temperature Waste Incinerator

Capacity at least (4000) kg/day ((Day=16 Working Hours))

Capacity at least (4000) kg/day ((Day=24 Working Hours))

With the following features:

*Automatic feeder as original part of the unit.

*Automatic ash / leftovers removal as original part of the unit.

*Water Injection System to control the temperature>

*Flue gas filtration system complying with EU.

*Continuous emission monitoring and recording system.

*It should include installation, testing, and staff training.

*6 nos. of heavy duty loading containers.

Item 4
HTW Incinerator model D
Burn Rate – 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Mobile Incinerator

Item 5
Mobile Incinerator model E

Burn Rate 50kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 850 °C, please indicate

One year Spare Parts Package for complete maintainability
Mobile Incinerator

Item 6
Mobile Incinerator model F

Burn Rate 100kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 850 °C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length

1000 Litre Fuel Tank + Pipe System, indicate volume

Additional chimney extension, indicate height

Warranty, indicate no of years
High Temperature Waste Mobile Incinerator
Item 7
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 1200 °C, please indicate
Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter

height
Warranty, indicate no of years

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]