HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]
medical waste incinerator for sale
Waste type: health care waste
Waste density: 125 to 350Kg/M3
Waste calorific value: 4000KCAL/kg
Moisture content: 10 – 25%
Estimated ash residue: 5 – 10%
Nominal capacity: 50kg/hr batch load
Secondary chamber: 2 seconds@850?C
Environmental: NEMA ACT (EMCA) 1999, Waste Management regulations, 2006
Primary Combustion chamber:
The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel sections.
It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate insulation and a hot face combination of super duty brickwork or high strength castable.
The primary combustion chamber must ensure minimum exit temp is not less than 850?C.
One Manual Load Incinerator comprising:
Manual loading door
Horizontal solid hearth, refractory lined primary combustion chamber. Approx. dimensions 800x2100mm(DxL)
Full sized bulk load/ash removal door
1 off diesel-fired ignition burner – temperature controlled
1 off combustion air supply fan and distribution system, automatic control
High capacity secondary combustion chamber with residence time not less than 2 seconds @>850?C
1 off diesel-fired afterburner – temperature controlled
Control panel – automatic operation
Temperature indication primary and secondary chambers 0-1200?C
Refractory lined flanged chimney to a height of 10M above ground level
NB: The secondary combustion chamber must ensure that the gas temp as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100?C
Throughput: 50kg/hr at a nominal calorific value of 4,000kca/kg and an average bulk density of 120kg/m3 for general waste and 160kg/m3 for health care waste.
Ash: The waste will be reduced by 90~95% to leave 10-5% ash
Quality/Environmental Standards: NEMA ACT (EMCA) 1999, BS3316
Operating period: anticipated daily operating period 8 hours
Maximum operating period: 12 hours
Chamber: should be refractory lined to the following standard;
Hearth and lower section of chamber walls
Hot face material:
Super duty firebrick
Limiting continuous service limit 1500?C
Thickness: 100mm
Thermal conductivity: 1.3W/mk
Insulation:
Calcium silicate
Limiting continuous service limit 1000?C
Thickness: 25mm
Thermal conductivity: 0.095W/mk
Chimney/Stack: Should be manufactured from refractory lined mild steel or high quality air-cooled s/s.
The chimney/stack should have a minimum height of 10m above ground level
Ignition burners: fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating: at least 450kW/hr
Burner: arranged for on/off operation
Maximum consumption: at least 6Ltrs/hr
Average consumption: at least 3Ltrs/hr
Afterburner:
fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating: at least 450kW/hr
Burner: arranged for on/off operation
Maximum consumption: at least 9Ltrs/hr
Average consumption: at least 4.5Ltrs/hr
Flue gas treatment: should have particulate remover (scrubbers)
Electrical supply: single phase: 220/240VAC; 50/60Hz
Documentation:
medical waste incinerator for sale Operation manual: 2 sets
Service/maintenance manual: 2 sets
Certification: NEMA (or other recognized) certification
Capacity to service equipment: the agent/supplier shall have adequate facilities, spare parts, consumables and qualified skilled technical staff.
Training: the Agent shall conduct a two days incinerators training after installation and commissioning of the equipment.
The Agent shall conduct a two days operation & maintenance training to the Biomedical engineering personnel after installation & commissioning of the equipment.